top of page

HIGH-RISE CONDO 

Jacksonville Florida 

A previous leaking pool on the upper level of a parking structure was causing chlorine water to flow into the structure and cause damage to the supporting members of the garage. 
.
CPR worked alongside another contractor once structural repairs were formed. Contractor removed and installed a new pool. We finished the job by laying the concrete on the pool perimeter. 

© 2020 by CPR Contracting.
We are an Equal Opportunity Employer.

  • Facebook - Grey Circle
  • Instagram
bottom of page